Orange Button BIM
Firestop clash detection, right in your browser.
BIM Online is the browser edition of Orange Button BIM. Import your IFC models, check them, find every firestop clash, measure the distances and send a complete clashlist to Orange Button Office. No Revit and no BIM experience required.
No Revit needed
Everything runs in the browser, so firestop specialists without BIM software can start right away.
Checked before you clash
A traffic-light checklist shows what information the models are missing, before you count a single clash.
Straight to Office
Upload the floor plans and the clashlist to Orange Button Office, where every clash gets a certified solution.
Try it yourself
Click through a demo of BIM Online.
A simplified demo with one small sample project and two IFC models: check the data, run the clash detection and measure the distances, in five steps, in your browser, without an account. Want to try all the features? Register now for free!
On a phone the demo opens full screen, in landscape. Close it at the top right.
The demo cannot be shown in this browser. Watch the video tour instead. Watch the video tour →
That was a small part of BIM Online.
Now with your own models: free up to 200 clashes a month.
Builders work openings
Clash against builders work openings, not just walls and floors.
On many projects, and on almost every project in the UK, the openings for services are builders work in connection (BWIC): holes, sleeves and voids formed before the services go in. Orange Button BIM clashes against those openings and automatically identifies and analyses every penetration that passes through them.
- 1Openings as a clash categoryBuilders work openings in the model, as void or opening elements, take part in clash detection next to walls, floors and fire-rated plates.
- 2Every penetration identifiedEvery pipe, duct and cable tray through an opening is found automatically and linked to that opening.
- 3Analysed against tested systemsOpening size and shape, the distance from each service to the edge of the opening and the space between services are checked against the rules of the tested systems.
- 4One opening, one MSPAn opening with two or more services becomes a multi-service penetration automatically, sized to the opening and numbered in the clashlist.
In BIM Online with your IFC models, and in Revit with the OneClick app Apertures.
Watch: Engineering, distances and MSPsVideo tour · BIM Online
From IFC files to a complete clashlist.
Twelve short videos: import and check your models, find and review every clash, measure the distances, send the result to Orange Button Office, and work with BWIC openings.
01Intro: what BIM Online makes
Read the transcript
01 Intro: what BIM Online makes
Welcome to BIM Online, the Orange Button viewer for IFC models. In this video you'll learn how to go from a set of IFC files to a complete Clashlist.
A clash is a spot where an installation – a pipe, a duct or a cable tray – passes through a construction, like a wall or a floor. Every clash needs a firestop solution. To find that solution, each clash needs the right Orange Button information: the construction type and thickness, the fire rating, and the installation type and size.
BIM Online finds the clashes for you, helps you fill in that information, checks the distances between penetrations, and sends the result to Orange Button Office. Let's walk through it step by step.
02 Getting in, the screen and your files
When you open a project from Orange Button Office, you're signed in automatically. Let's look at the screen.
Top left is the toolbar with the main tools. Files. Data Manager. Clash Detection. Engineering. And Save & Export.
In the middle you'll find the floor plans. The Category Filter. And a search box.
In the top-right corner is the ViewCube. Next to it is your account menu, where you can switch between light and dark mode.
Start in the Files panel. Click Import IFC File and select all your models at once – or just drag them onto the screen.
BIM Online reads each file's discipline from its name: architectural, structural, plumbing, Advice and so on. Check it here. The discipline matters – an Advice file, for example, is treated as fire-rating information, not as real walls. If it's wrong, change it from the dropdown.
Sometimes a model contains one element kilometres away, so everything looks tiny. Use Crop project: BIM Online suggests a box around the real building. Adjust it and confirm. Elements outside are hidden and left out of clash detection.
In the next video you'll learn to move around the model.
03 Moving around the model
A 3D model only helps if you can find your way around it. In this video you'll learn to move through the building, select elements and look inside – with the mouse, the view buttons and the filters.
The left mouse button orbits. The right mouse button pans. And the scroll wheel zooms towards whatever is under your cursor. You can zoom right through walls to get inside the building.
Hover over an element to see an orange outline and its name just below the top bar. If several elements sit behind each other, press Tab to step through them.
A single click does nothing – double-click to select. The element is highlighted, the view zooms to it and its properties open on the right. Double-click empty space to clear the selection.
Next to the ViewCube are three buttons. Reset view. And X-ray, which makes the construction files transparent so you can see the installations inside.
The third is the section box. With nothing selected it covers the whole project; with an element selected it boxes that element. Drag the handles to cut the model open.
Under the cube you switch between perspective and orthographic. Click X-ray and the section box again to switch them off.
The Category Filter shows or hides whole categories. The small square sets whether a category gets a solid fill where the section box cuts it. Click a category name to go one level deeper: every type in that category, each with its own visibility, colour and transparency. For example, give the pipes and ducts a bright colour. Then switch on X-ray to make the construction transparent – the installations stand out at once.
Finally, the search box. Type part of a name or a type code and everything that doesn't match fades out.
Next, we'll look at an element's properties and the Orange Button parameters.
04 Properties and Orange Button parameters
The Properties panel shows everything about the selected element. The top part is Orange Button: the information the firestop solution needs. Below are the original IFC properties from the model, which you can read but not change.
BIM Online fills in as much Orange Button data as it can from the IFC file. Where something is missing you'll see a dash. Hover a value and click to edit it – types are picked from a list, sizes you type in millimetres.
If no property gives a size, BIM Online measures the geometry and suggests a value. It never fills it in by itself – click Use if the suggestion is right.
Looking for a property? Use the search box at the top of the panel. Want to see an IFC property for all elements? Right-click it and add it to a Data Manager table.
Every kind of element has its own properties. A wall carries its fire rating and thickness. A pipe carries its system and diameter. With the Category Filter you show only the pipes. Hover one to see what it is.
Next, we'll set up the building storeys and floor plans.
05 Building storeys and floor plans
Floor plans organise everything in BIM Online: clashes are numbered per level and the Clashlist is grouped by them. Before you run clash detection, open Building storeys & floor plans.
The storeys come from one of your IFC models. Choose which model to take them from – usually the architectural one. Then tick the storeys you need. Each ticked storey becomes a floor plan.
Each floor plan runs from a bottom level to a top level, taken from the storeys in the IFC. With the offsets you move those limits up or down. The cut plane sets the height at which the plan is cut – usually one and a half metres above the floor.
Need to see more or less of a level? Change its offsets here, and the floor plan follows at once. If you skip this dialog, BIM Online will ask you when you open the clash tools.
Pick a level from the dropdown to see its plan from above. Clashes show up as pins.
A floor plan has its own tools. The cube shows the plan as a 3D inspection view. Place Marker adds a clash by hand. And with the fire rating brush you click walls to give them a fire rating – Ctrl and the scroll wheel change the value. The eraser clears it again.
Choose All Levels to go back to 3D.
With the floor plans set up, the next step is to check the models, with the Checklist.
06 Checking the models: the Checklist
Before you look for clashes, check whether the models contain the information a firestop solution needs. That's what the Checklist is for.
Every wall, floor and installation gets a row with a traffic light. Green is complete. Orange is worth a look. Red means required information is missing. The missing cells are coloured too.
In our usual process the checklist goes to the client first. Export it as a PDF from Save and Export. Per file and category it shows what's complete, so the modellers know what to improve.
When the improved models come back, import them again, and the checklist updates by itself.
Some information you can add yourself. Double-click a red cell and pick the right value. The traffic light turns green.
When the checklist is green, you're ready for clash detection.
07 Setting up and running clash detection
Open Clash Detection. The first time you run it, an overview shows which categories take part. BIM Online sets sensible defaults based on your files, so you rarely need to change them.
Want to know exactly what counts as a clash? Click the info button. It explains the rules for walls, floors and openings, step by step.
When the models change, run detection again. Update keeps what you've already checked – marks, approvals and removed clashes – and adds what's new. Add only leaves every existing clash as it is. Replace starts over.
You can also run it for certain installation files only, and keep the existing clash numbers.
Click Run. On a big project this can take a few minutes, and you can cancel at any time. When it's done, every clash appears as a marker in the model and in the list.
Next, we'll review the clashes one by one.
08 Reviewing clashes
The Clash panel lists every clash, grouped by construction or by floor plan. Use the filters to narrow it down – for example, only floors, or only ducts.
Open a group and BIM Online cuts the model around that wall so you see just its clashes. Check each one. Tick it to approve – the marker turns green. Not a real clash? Remove it; you'll find it back under Removed.
BIM Online combines what belongs together: a pipe through a wall with three layers is one clash, not three. The badge shows how many elements were combined. Click it to see exactly what's inside, and separate an element if it shouldn't be there.
In 3D every clash has a sphere, an outline on both faces of the wall and a flag with its number. Right-click a clash for all its actions – including moving it within its wall.
Missing a clash? Use Place manual clash and click the spot. Working on an apartment building where only one apartment is modelled? Copy its clashes, then paste them in the other apartments – rotate with R, mirror with M – or paste them to several levels at once with To levels. Copied and manual clashes are kept when you run detection again.
You can also check the clashes on a floor plan. Pick a level: every clash is a pin. Click a pin to select that clash.
Once every clash is checked, the next step is to complete their information – in the Data Manager.
09 The Data Manager
The Data Manager is where you check and complete information in bulk. On the left are your tables.
You know the Checklist from the previous video. Here we look at the other tables, starting with the Clashlist.
The Clashlist is exactly what will be sent to Orange Button Office – every row is a clash. Click a row to find the clash in 3D, or switch to In view to see only the clashes you're looking at.
A red cell means a clash is still missing information. Double-click it, pick the right value, and the traffic light follows.
Use the toolbar to choose columns, add filters and group or sort. Grouping by installation type, for example, shows every type once. Fill in a group, and every clash in it follows. Like the result? Store it as a schedule of your own.
Number your clashes from the Number button. Choose a prefix and start number, limit it to certain levels or sections if you like, and run. Clashes and MSPs are numbered separately.
Press the i button for all keyboard shortcuts. And under Stored Sections you keep the section boxes you want to come back to.
In the next video, Engineering checks the space around your penetrations.
10 Engineering: distances and MSPs
Firestop products need space around them. Engineering measures that space for every wall and floor with penetrations. There are three distances. A: between penetrations. B: from a penetration to the edge of an opening or block. C: between services inside one opening or block. Set the required values in Settings – per construction type or installation type.
Click Measure distances. When it's done, every wall and floor with penetrations is listed per level. The red number shows how many problems each one has.
Open a wall to see where the problem is. Here two pipes are only 60 millimetres apart, where 100 is needed. There are two ways to fix it. Combine them into one MSP – a multi-service penetration, sealed as one block. Or move the penetrations further apart in the model.
The Engineering viewer shows each wall in detail. Front, side and top views with dimensions. The 3D model. And the floor plan. You can draw or adjust MSP boxes, measure, and leave comments. Then mark the wall as approved.
Approving an MSP numbers it and adds it to the Clashlist as one block. Openings that hold two or more clashes become an approved MSP automatically. Back in the 3D view, Place suggested MSPs does this for every wall at once. When you're done, export the engineering report: per level a plan, then one sheet per wall with all views, sizes and comments.
Next, we'll save the project and send the result to Orange Button Office.
11 Saving, exporting, help and outro
Everything is saved through Save & Export. Save a draft to the server with Ctrl+S while you work; publish a version when it's ready for others.
Then send the result to Orange Button Office: upload the floor plans, then the Clashlist. Before uploading, BIM Online warns you if clashes are missing information needed to find a solution. You can still upload, but it's better to fix it first.
Need the clashes back in your BIM software? Export them as IFC – a full file you can re-import, or a quotation or engineering deliverable.
Stuck? Most panels have a video button with a short guide.
That's BIM Online: import, check, detect, complete, engineer and upload. In one more video, we look at how BIM Online works with BWIC openings.
12 BWIC: openings for services
In the UK, the openings for services are often designed before the firestops: builder's work in connection, or BWIC. When those openings are in the model, BIM Online puts them to work.
Open the Data Manager and choose Openings. Every opening in the model is listed, with its number, its shape and its size. The number is taken from the opening's own Mark.
To link them to the clashes, open Clash Detection and click Re-run. Under Clash settings, tick Data for Openings: an opening then gives its number and size to the clash it sits in.
Then choose Opening information only. Your clashes stay as they are; only the opening at each clash is looked up. BIM Online shows what it found before you apply it.
In the Clashlist, add the Opening Number and MSP columns. Where two or more services pass through the same opening, it becomes an MSP: a multi-service penetration, sealed as one block.
So the Clashlist shows at a glance which services pass through which opening.
Engineering uses the same openings. Its wall views show each opening with the services inside, so the firestop design matches the builder's work on site.
So the openings, the clashes and the firestops line up: one Clashlist that tells the builder, the installer and the firestop specialist the same thing.
In the UK, the Building Safety Act asks for a golden thread: for higher-risk buildings, every opening must be traceable from early design to the work on site. Orange Button covers that whole thread. The opening is designed and checked here, in BIM Online. Orange Button Office picks the certified firestop. And on site, the installer records it in the Field app, with a photo and a status.
Thanks for watching.
BIM Online
Short videos per panel
One short video for every panel in BIM Online, plus a preview of the Compliance Checker.
What BIM Online does
- 01
Import and prepare your models
Drop in all your IFC files at once. BIM Online reads each file’s discipline from its name, so a fire-rating advice model is treated as information, not as walls.
- Architectural, structural and MEP models together
- Crop project to hide stray elements far from the building
- X-ray, section box and category filter to look inside
- 02
The information a firestop needs
Every element carries its Orange Button parameters: construction type and thickness, fire rating, and installation type and size. BIM Online fills in what it can from the IFC; you complete the rest.
- Missing values shown at a glance
- Types picked from a list, sizes in millimetres
- Original IFC properties kept read-only
- 03
The Checklist
Before you look for clashes, every wall, floor and installation gets a traffic light. Send the checklist to the modeller as a PDF; when the improved models come back, it updates by itself.
- Green complete, orange worth a look, red missing
- PDF per file and category
- Fill in missing values yourself
- 04
Clash detection by rules
Clashes are found from fixed rules for walls, floors and builders work openings, and numbered per floor plan. A pipe through a wall of three layers is one clash, not three.
- Building storeys and floor plans from your IFC
- Run again after model changes: update keeps your checks
- Approve or remove each clash, or place one by hand
- 05
Complete it in bulk
The Data Manager shows the Clashlist exactly as it goes to Office. Group, filter and fill in a whole group at once, then number your clashes and MSPs.
- Red cells show missing information
- Fill in a group, every clash follows
- Numbering per level, with your own prefix
- 06
Engineering and the Compliance Checker
Firestop products need space. Engineering measures every wall and floor with penetrations against the distances you set, and helps you solve what doesn’t fit.
- A between penetrations, B to the edge of the opening, C inside one opening
- Combine penetrations into an MSP, or move them apart
- Engineering report: a plan per level and a sheet per wall
- 07
To Office, and back to BIM
Save drafts while you work and publish a version when it’s ready. Upload the floor plans and the clashlist to Orange Button Office, or export the clashes as IFC.
- A warning before you upload incomplete clashes
- IFC export to re-import in your BIM software
- A video guide in most panels
New · Compliance Checker
Every A, B and C distance, checked automatically.
The Compliance Checker in OB BIM checks all distances between installations and openings in your project. In BIM Online you find it under Engineering. It flags every violation, helps you solve it and produces a report you can share.
- ABetween installationsMinimum distance between elements, per element type and construction category.
- BTo the edge of the openingMinimum distance from each element to the edge of an opening or multi-service penetration.
- CInside one openingMinimum distance between element types within a single opening or MSP.
Set your own distance tables per firestop solution, run the check on all clashes, and export the violations per construction as a PDF.Watch the preview →
Also available
Prefer to work in Revit?
The Revit Edition brings the same clash engine into Autodesk Revit, together with OneClick apps that take the repetitive work out of firestop modelling.
- AperturesCheck and create openings for every service in one go.
- Multi-service penetrationsGroup services into one opening according to tested rules.
- NumberingNumber every firestop location consistently.
- BatchLinkLink a batch of models at once.
Revit Edition
Videos for the Revit Edition
Install the plugin, link your models and find the firestop clashes in Autodesk Revit, and the OneClick apps that take the repetitive work out of it.
Questions
What is a firestop clash?
A firestop clash is a place where a service, such as a pipe, duct or cable tray, passes through a fire-rated wall or floor. Each of those openings needs a tested penetration seal: a certified firestop solution.
Can Orange Button clash against builders work openings?
Yes. Builders work openings (BWIC) in the model take part in clash detection. Every penetration through an opening is identified automatically and analysed against the tested systems: opening size and shape, distance to the edge and between services. An opening with two or more services becomes one multi-service penetration (MSP).
How are clashes counted?
Each unique clash position counts as one clash. The first 200 each month are free; above that the price per clash drops as your volume grows.
Do I need Autodesk Revit?
No. BIM Online runs entirely in your browser. The Revit Edition is there for teams that already model in Revit and want the OneClick apps.
