Videos
Sehen Sie jedes Produkt in Aktion.
Drei Video-Touren, direkt aus der Software. Sehen Sie sie der Reihe nach an, oder springen Sie zum gewünschten Kapitel.
Videotour · BIM Online
Von IFC-Dateien zur vollständigen Clash-Liste.
Zwölf kurze Videos: Modelle importieren und prüfen, jeden Clash finden und prüfen, die Abstände messen, das Ergebnis an Orange Button Office senden und mit Öffnungen arbeiten.
01Intro: was BIM Online leistet
Transkript lesen
01 Intro: was BIM Online leistet
Welcome to BIM Online, the Orange Button viewer for IFC models. In this video you'll learn how to go from a set of IFC files to a complete Clashlist.
A clash is a spot where an installation – a pipe, a duct or a cable tray – passes through a construction, like a wall or a floor. Every clash needs a firestop solution. To find that solution, each clash needs the right Orange Button information: the construction type and thickness, the fire rating, and the installation type and size.
BIM Online finds the clashes for you, helps you fill in that information, checks the distances between penetrations, and sends the result to Orange Button Office. Let's walk through it step by step.
02 Anmelden, Bildschirm und Dateien
When you open a project from Orange Button Office, you're signed in automatically. Let's look at the screen.
Top left is the toolbar with the main tools. Files. Data Manager. Clash Detection. Engineering. And Save & Export.
In the middle you'll find the floor plans. The Category Filter. And a search box.
In the top-right corner is the ViewCube. Next to it is your account menu, where you can switch between light and dark mode.
Start in the Files panel. Click Import IFC File and select all your models at once – or just drag them onto the screen.
BIM Online reads each file's discipline from its name: architectural, structural, plumbing, Advice and so on. Check it here. The discipline matters – an Advice file, for example, is treated as fire-rating information, not as real walls. If it's wrong, change it from the dropdown.
Sometimes a model contains one element kilometres away, so everything looks tiny. Use Crop project: BIM Online suggests a box around the real building. Adjust it and confirm. Elements outside are hidden and left out of clash detection.
In the next video you'll learn to move around the model.
03 Im Modell navigieren
A 3D model only helps if you can find your way around it. In this video you'll learn to move through the building, select elements and look inside – with the mouse, the view buttons and the filters.
The left mouse button orbits. The right mouse button pans. And the scroll wheel zooms towards whatever is under your cursor. You can zoom right through walls to get inside the building.
Hover over an element to see an orange outline and its name just below the top bar. If several elements sit behind each other, press Tab to step through them.
A single click does nothing – double-click to select. The element is highlighted, the view zooms to it and its properties open on the right. Double-click empty space to clear the selection.
Next to the ViewCube are three buttons. Reset view. And X-ray, which makes the construction files transparent so you can see the installations inside.
The third is the section box. With nothing selected it covers the whole project; with an element selected it boxes that element. Drag the handles to cut the model open.
Under the cube you switch between perspective and orthographic. Click X-ray and the section box again to switch them off.
The Category Filter shows or hides whole categories. The small square sets whether a category gets a solid fill where the section box cuts it. Click a category name to go one level deeper: every type in that category, each with its own visibility, colour and transparency. For example, give the pipes and ducts a bright colour. Then switch on X-ray to make the construction transparent – the installations stand out at once.
Finally, the search box. Type part of a name or a type code and everything that doesn't match fades out.
Next, we'll look at an element's properties and the Orange Button parameters.
04 Eigenschaften und Orange-Button-Parameter
The Properties panel shows everything about the selected element. The top part is Orange Button: the information the firestop solution needs. Below are the original IFC properties from the model, which you can read but not change.
BIM Online fills in as much Orange Button data as it can from the IFC file. Where something is missing you'll see a dash. Hover a value and click to edit it – types are picked from a list, sizes you type in millimetres.
If no property gives a size, BIM Online measures the geometry and suggests a value. It never fills it in by itself – click Use if the suggestion is right.
Looking for a property? Use the search box at the top of the panel. Want to see an IFC property for all elements? Right-click it and add it to a Data Manager table.
Every kind of element has its own properties. A wall carries its fire rating and thickness. A pipe carries its system and diameter. With the Category Filter you show only the pipes. Hover one to see what it is.
Next, we'll set up the building storeys and floor plans.
05 Geschosse und Grundrisse
Floor plans organise everything in BIM Online: clashes are numbered per level and the Clashlist is grouped by them. Before you run clash detection, open Building storeys & floor plans.
The storeys come from one of your IFC models. Choose which model to take them from – usually the architectural one. Then tick the storeys you need. Each ticked storey becomes a floor plan.
Each floor plan runs from a bottom level to a top level, taken from the storeys in the IFC. With the offsets you move those limits up or down. The cut plane sets the height at which the plan is cut – usually one and a half metres above the floor.
Need to see more or less of a level? Change its offsets here, and the floor plan follows at once. If you skip this dialog, BIM Online will ask you when you open the clash tools.
Pick a level from the dropdown to see its plan from above. Clashes show up as pins.
A floor plan has its own tools. The cube shows the plan as a 3D inspection view. Place Marker adds a clash by hand. And with the fire rating brush you click walls to give them a fire rating – Ctrl and the scroll wheel change the value. The eraser clears it again.
Choose All Levels to go back to 3D.
With the floor plans set up, the next step is to check the models, with the Checklist.
06 Modelle prüfen: die Checkliste
Before you look for clashes, check whether the models contain the information a firestop solution needs. That's what the Checklist is for.
Every wall, floor and installation gets a row with a traffic light. Green is complete. Orange is worth a look. Red means required information is missing. The missing cells are coloured too.
In our usual process the checklist goes to the client first. Export it as a PDF from Save and Export. Per file and category it shows what's complete, so the modellers know what to improve.
When the improved models come back, import them again, and the checklist updates by itself.
Some information you can add yourself. Double-click a red cell and pick the right value. The traffic light turns green.
When the checklist is green, you're ready for clash detection.
07 Kollisionsprüfung einrichten und starten
Open Clash Detection. The first time you run it, an overview shows which categories take part. BIM Online sets sensible defaults based on your files, so you rarely need to change them.
Want to know exactly what counts as a clash? Click the info button. It explains the rules for walls, floors and openings, step by step.
When the models change, run detection again. Update keeps what you've already checked – marks, approvals and removed clashes – and adds what's new. Add only leaves every existing clash as it is. Replace starts over.
You can also run it for certain installation files only, and keep the existing clash numbers.
Click Run. On a big project this can take a few minutes, and you can cancel at any time. When it's done, every clash appears as a marker in the model and in the list.
Next, we'll review the clashes one by one.
08 Clashes prüfen
The Clash panel lists every clash, grouped by construction or by floor plan. Use the filters to narrow it down – for example, only floors, or only ducts.
Open a group and BIM Online cuts the model around that wall so you see just its clashes. Check each one. Tick it to approve – the marker turns green. Not a real clash? Remove it; you'll find it back under Removed.
BIM Online combines what belongs together: a pipe through a wall with three layers is one clash, not three. The badge shows how many elements were combined. Click it to see exactly what's inside, and separate an element if it shouldn't be there.
In 3D every clash has a sphere, an outline on both faces of the wall and a flag with its number. Right-click a clash for all its actions – including moving it within its wall.
Missing a clash? Use Place manual clash and click the spot. Working on an apartment building where only one apartment is modelled? Copy its clashes, then paste them in the other apartments – rotate with R, mirror with M – or paste them to several levels at once with To levels. Copied and manual clashes are kept when you run detection again.
You can also check the clashes on a floor plan. Pick a level: every clash is a pin. Click a pin to select that clash.
Once every clash is checked, the next step is to complete their information – in the Data Manager.
09 Der Data Manager
The Data Manager is where you check and complete information in bulk. On the left are your tables.
You know the Checklist from the previous video. Here we look at the other tables, starting with the Clashlist.
The Clashlist is exactly what will be sent to Orange Button Office – every row is a clash. Click a row to find the clash in 3D, or switch to In view to see only the clashes you're looking at.
A red cell means a clash is still missing information. Double-click it, pick the right value, and the traffic light follows.
Use the toolbar to choose columns, add filters and group or sort. Grouping by installation type, for example, shows every type once. Fill in a group, and every clash in it follows. Like the result? Store it as a schedule of your own.
Number your clashes from the Number button. Choose a prefix and start number, limit it to certain levels or sections if you like, and run. Clashes and MSPs are numbered separately.
Press the i button for all keyboard shortcuts. And under Stored Sections you keep the section boxes you want to come back to.
In the next video, Engineering checks the space around your penetrations.
10 Engineering: Abstände und MSPs
Firestop products need space around them. Engineering measures that space for every wall and floor with penetrations. There are three distances. A: between penetrations. B: from a penetration to the edge of an opening or block. C: between services inside one opening or block. Set the required values in Settings – per construction type or installation type.
Click Measure distances. When it's done, every wall and floor with penetrations is listed per level. The red number shows how many problems each one has.
Open a wall to see where the problem is. Here two pipes are only 60 millimetres apart, where 100 is needed. There are two ways to fix it. Combine them into one MSP – a multi-service penetration, sealed as one block. Or move the penetrations further apart in the model.
The Engineering viewer shows each wall in detail. Front, side and top views with dimensions. The 3D model. And the floor plan. You can draw or adjust MSP boxes, measure, and leave comments. Then mark the wall as approved.
Approving an MSP numbers it and adds it to the Clashlist as one block. Openings that hold two or more clashes become an approved MSP automatically. Back in the 3D view, Place suggested MSPs does this for every wall at once. When you're done, export the engineering report: per level a plan, then one sheet per wall with all views, sizes and comments.
Next, we'll save the project and send the result to Orange Button Office.
11 Speichern, Exportieren, Hilfe und Abschluss
Everything is saved through Save & Export. Save a draft to the server with Ctrl+S while you work; publish a version when it's ready for others.
Then send the result to Orange Button Office: upload the floor plans, then the Clashlist. Before uploading, BIM Online warns you if clashes are missing information needed to find a solution. You can still upload, but it's better to fix it first.
Need the clashes back in your BIM software? Export them as IFC – a full file you can re-import, or a quotation or engineering deliverable.
Stuck? Most panels have a video button with a short guide.
That's BIM Online: import, check, detect, complete, engineer and upload. In one more video, we look at how BIM Online works with BWIC openings.
12 Öffnungen für Installationen (BWIC)
In the UK, the openings for services are often designed before the firestops: builder's work in connection, or BWIC. When those openings are in the model, BIM Online puts them to work.
Open the Data Manager and choose Openings. Every opening in the model is listed, with its number, its shape and its size. The number is taken from the opening's own Mark.
To link them to the clashes, open Clash Detection and click Re-run. Under Clash settings, tick Data for Openings: an opening then gives its number and size to the clash it sits in.
Then choose Opening information only. Your clashes stay as they are; only the opening at each clash is looked up. BIM Online shows what it found before you apply it.
In the Clashlist, add the Opening Number and MSP columns. Where two or more services pass through the same opening, it becomes an MSP: a multi-service penetration, sealed as one block.
So the Clashlist shows at a glance which services pass through which opening.
Engineering uses the same openings. Its wall views show each opening with the services inside, so the firestop design matches the builder's work on site.
So the openings, the clashes and the firestops line up: one Clashlist that tells the builder, the installer and the firestop specialist the same thing.
In the UK, the Building Safety Act asks for a golden thread: for higher-risk buildings, every opening must be traceable from early design to the work on site. Orange Button covers that whole thread. The opening is designed and checked here, in BIM Online. Orange Button Office picks the certified firestop. And on site, the installer records it in the Field app, with a photo and a status.
Thanks for watching.
Videotour · Office
Von der Clash-Liste zur freigegebenen Abschottung.
Vierzehn kurze Videos: Unternehmen und Hersteller einrichten, zertifizierte Lösungen generieren und die Arbeit auf der Baustelle bis zum Bericht verfolgen.
01Orange Button Office im Überblick
Transkript lesen
01 Orange Button Office im Überblick
Welcome to Orange Button Office. A firestop is only certified when it is installed exactly as its approval says. Office finds the solution that fits each penetration.
The firestop is the last trade on site, after the main contractor, the installer and the drywall specialist. So it has to be fast, and right first time. Even better: with good engineering you are involved earlier, in the design phase.
The dashboard shows at a glance how your projects are doing.
Under Projects you find all your projects, each in its own phase.
Open a project and you see its clashlist. For every penetration it shows which certified solution goes with it.
Solutions and Components hold the products of the manufacturers you work with.
And then Field activities. This is where the work from site comes in, until it's approved.
In the next videos we look at the settings and get Office ready to use.
02 Das Dashboard und die Navigation
After you sign in you land on the dashboard. At the top you first see your projects. Next to them is today's activity. Then your preferred solutions. And here you see how much of your licence you've used.
Below are your recent projects. The strip above them counts your projects per phase: checklist, quotation, engineering, construction and maintenance.
On the right is your company, with its users. Below it are your preferred manufacturers.
At the top of the screen, the bar shows how many clashes your licence has left. The bell shows new notifications.
And on the left is the menu. Hover over an icon to see its name.
Click Projects in the menu. Here all your projects are in one list, with their number, phase, city and how many clashlists they have. Click a phase to see only those projects. And click a project to open it.
In the next video you set up your company and your account.
03 Ihr Unternehmen: Einstellungen und Benutzer
Before your first project, check your settings.
Under Personal settings you choose your language. You also choose which columns you see in a clashlist.
2FA protects your account. Keep your recovery codes somewhere safe.
The company settings decide which solutions Office can offer you. That depends on the countries you work in. And on the technical standards you use, such as European Technical Approval.
Here you also set the language of your reports. And you decide what viewers of a project are allowed to see.
On the right, Employees lists everyone in your company, with their role.
Under Users you invite your colleagues.
Click Invite new user and fill in your colleague's name and email address. They get an email to set up their account.
In the next video you choose the manufacturers you work with.
04 Lösungen: Ihre Hersteller und Favoriten
Office only proposes solutions from the manufacturers you choose. So the first thing to set up is Solutions.
Click Select manufacturers: you'll see the brands that are available for your country and your technical standards.
Pick the ones you work with and save.
Now every solution from those manufacturers is listed. Each one is a tested and certified way to seal one kind of penetration.
Its name says what it is: manufacturer, what passes through, the construction, the products and the shape of the opening. Filter on construction or installation to find what you need.
A star gives a manufacturer or a solution priority: that's how you set your preference. Click the star next to a manufacturer. Or click the star next to a single solution, for example the one your installers know best.
When more than one solution fits a clash, Office ranks them: a starred manufacturer comes first, and within that a starred solution. So a star on a manufacturer lifts all of its solutions. Filter on Preference to see your starred solutions.
The Usage column shows how often you've used a solution in your projects, and the document icon takes you to the manufacturer's own information about it.
Let's open one.
This solution seals a bundle of air-conditioning pipes. It goes in a solid wall. And the opening is round. The description is the text the manufacturer added to this solution, with the fire rating it is tested for – here up to 120 minutes.
Below are the components it's made of. You also see the countries where it's approved. On the right is the Revit object. Next to it, a 3D image of the finished seal. If an image is missing, the manufacturer hasn't made it available, so it won't appear in your report either.
In the next video you choose your manufacturers for Components too.
05 Komponenten
Components are the products a solution is made of: sealants, foams, coated boards and collars. Choose your manufacturers here too – the list can differ from Solutions.
Each component has its code. Next to it is a short description. The globe takes you to the product page on the manufacturer's site.
Stars work the same as in Solutions: keep the products you use starred.
In the next video you start a project and see how it moves through its phases.
06 Ein Projekt, seine Phasen und zwei Arbeitsweisen
Open a project. Every project has a number. It has a name. And it's in a phase.
In general, the phase follows your work. In the checklist phase you check that all the information is there. In the quotation phase you set the design and the cost. In engineering, Office picks the solutions. Then come construction and maintenance. When a project is finished, you archive it. Change the phase with this button.
The tabs below hold everything about the project. The first tab, Project, gives the overview: contacts and location, recent activity, and progress on site. On the right you also see who has access.
The people and companies you work with are under Contacts: the client, the main contractor, the installer. Link them to a project, and their details are on the project page.
To start a new project, click Add a new project and fill in its number, name, company, city and date.
Now, how do the penetrations get into your project? That depends on what you have. If there's a BIM model, the clashes come from the model – that's our first demo project.
If there's no model, you work from PDF floor plans and record the penetrations on site – that's the second.
We'll start with the BIM project: in the next video, its BIM tab.
07 Ein BIM-Projekt: der Reiter BIM
The BIM tab shows the model versions saved from BIM Online, with the number of clashes and elements in each.
Click Go To BIM to open the project in BIM Online, where you load the IFC files and find the clashes.
That has a video of its own; here we continue with what comes out of it: the clashlist.
08 Ein BIM-Projekt: Clash-Listen und Lösungen
A clashlist is the list of every penetration in the project, with the information needed to seal it.
You upload it from BIM Online – or from Revit – and it appears here. The bar shows how many of the clashes already have a solution.
Below is the product selection. Each row is one clash: where it is, what passes through what, and the sizes. Filter any column to narrow the list.
Now for the orange button: click Generate solutions. Next, choose how Office looks for them: here, by the application areas of the solutions.
For every clash, Office looks for a solution from your manufacturers that is approved for that construction, fire rating, installation, insulation and opening, and for the sizes involved. No more searching through approvals and drawings by hand: quotations and designs are up to ten times faster. The distances that matter too – between services, to other openings and to the supports – are checked in BIM Online, under Engineering.
Click a solution to see exactly what it is. Where no solution fits, the row stays empty. Open the clash and look under Incompatible solutions: it lists the near misses and marks in red which property ruled each one out — often a single measurement.
Office proposes, you decide. Not happy with a choice? Pick another solution yourself. Clashes that are identical are grouped, so one choice covers the whole group at once.
Export the result to Excel to work with it yourself. Or export it as a file for other software.
In the next video you see the floor plans of a BIM project.
09 Ein BIM-Projekt: Grundrisse
In a BIM project the floor plans come from BIM Online, one per level, with every clash marked on it.
Drag them into the order you want. You can also download any plan as an image.
These are the plans your installers see in the Field app.
In the next video you work without a model, from PDF floor plans.
10 Ein klassisches Projekt: PDF-Grundrisse
Not every project has a BIM model. In a traditional project you start from the drawings you have.
There's no clashlist here. Instead, open Floor plans. That's where you upload your PDF floor plans.
Put them in the right order. That's all Office needs: the penetrations themselves are recorded on site.
How that works with the Field app on site, you see in the next video.
11 Auf der Baustelle mit der Field-App
On site, your installers use the Orange Button Field app. Before they go, they download the project, so it works without signal too.
They open a floor plan. Every marker is a penetration to seal.
Found a new one? Tap the plus and put it on the plan.
Then enter what passes through what: the construction, its fire rating, and the service.
The app proposes the solutions from your manufacturers that fit. Choose one, and confirm.
Once it's sealed, take a photo of it. Then set the status.
Back online? Press and hold the project, and tap Synchronize.
The work from site then appears in Office, under Field activities.
12 Field-Aktivitäten
Everything done on site comes together under Field activities – whether it started from a BIM model or from a PDF.
In a traditional project the activities are created on site; you see them here as Manual.
A basement or a stairwell rarely has reception. Work recorded without a signal stays on the phone and is uploaded as soon as it's back online, so nothing is lost.
Each activity has a status: new, scheduled, in progress, done, approved, not approved, damaged or maintenance. These are the standard statuses; you can adapt them to the way you work. Filter on status to see what still needs attention.
Open an activity to see all its details: the opening, the construction, the fire rating and the installation.
When the work is done, generate a report: proof for your client of every firestop in the building.
The report is built in the background, so you can carry on working. You get an email as soon as it's ready.
Open it from Documents. Every firestop in the building is in it: the construction, the installation, and the certified system with its products.
In the next video you keep documents with the project and share it.
13 Bilder, Dokumente und Teilen
Images and Documents keep everything that belongs to the project: the photos from site, drawings, and the reports you've generated.
Under Syncs you see every sync from the Field app: who worked offline, when they synchronised, and which activities were added or changed.
To work together, add colleagues under Users.
For your client or the building owner, use viewer mode. With it you create a read-only link. It shows the floor plans and the progress on site, without giving access to the rest of your project.
In the last video we look at your licences and where to find help.
14 Lizenzen, Support und Abschluss
Click Licences in the menu. Here you see your Office licence. Above it is your clash balance. The clashes you upload come off your balance; the bar at the top shows what's left.
Under Apps you download the Field app for your installers.
Questions? Then click Support. Or watch the other videos in this series.
That's Orange Button Office: with a model or without, from penetration to solution to an approved firestop on site. Because every building is built twice: first in BIM, then for real. Thanks for watching.
Videotour · Field
Die Field-App auf der Baustelle.
Fünf kurze Videos: offline arbeiten, sich in den Grundrissen zurechtfinden, Durchführungen erfassen, die Lösung wählen und die Arbeit mit Fotos nachweisen.
01Offline arbeiten und synchronisieren
Transkript lesen
01 Offline arbeiten und synchronisieren
Your installers record their work on site with the Orange Button Field app. Their projects are on the start screen.
Sites often have no signal. So before you go, download the project. Tap the download icon and choose what to take along: the solutions and components, and the images.
The download takes a minute or so. Keep the app open until it's done.
Then a message tells you the project is ready for offline use.
The crossed-out cloud at the top shows you're working offline. Everything you record is saved on the phone.
Under Account, Offline settings decide which manufacturer libraries stay on the phone. With them, you can choose a solution without a connection.
Back online? Press and hold the project, and tap Synchronize.
Your changes go to Orange Button Office. A message confirms that the sync has been submitted.
Under Sync you see every synchronization. Open one to see what it sent: here, one floor plan with two activities.
And there it is: sync complete. In Office, the work from site is now there for the whole team.
In the next video we open a project and find our way around its floor plans and activities.
02 Grundrisse und Aktivitäten
Open a project. Info shows its progress: how many activities have each status. Below it are the address and the team.
Under Plans, every floor has its own floor plan, with the status of its activities.
Open a floor. Each marker on the plan is an activity: one penetration to seal. Its colour shows the status. Tap a marker, and the activity appears in the list below.
The filter shows only what you need. Filter on status, on the construction, or on the installation. Here, only the shaft flexible walls.
Switch everything back on to see the whole plan again.
Activities lists everything in the project. Your own activities are at the top, the rest below.
A multi-service installation folds open to show the services inside it.
In the next video you record a penetration that isn't on the plan yet.
03 Eine Durchführung erfassen
Found a penetration that isn't on the plan yet? Tap the plus, and put the cross on its spot.
The app gives it the next free number. You can add a comment or a photo.
Choose the construction it passes through, its thickness and its fire rating. The app needs these to propose a solution.
Then the opening, and whether one service passes through, or several.
Pick what passes through: here, a multilayer pipe. Add its material, shape and diameter, and the insulation. Then tap Create.
The new activity is on the plan, with the status New.
Several services through one opening? Choose Multiservice. Each service gets its own number under the same opening.
Add each service with the plus: what it is, and its size.
Tap Create, and the multi-service installation is on the plan, with its services inside.
You can also copy an activity. Press and hold it in the list, choose Duplicate, and place the copy on the plan.
Then change the copy where it differs. This one goes through a floor of 200 millimetres, with a fire rating of 60 minutes.
Next, you choose the solution or the components you install.
04 Eine Lösung oder Komponenten wählen
Open an activity. Its details are filled in: the construction, the opening and the installation.
Tap Select solution or components. The app lists every solution from your manufacturers that fits this situation.
Tap the one you install, and confirm.
The activity now shows the solution: a 3D image of the finished seal, its description, the fire rating it is approved for, and the components it is made of.
If no solution fits, you can still choose the components you use, filtered by manufacturer.
Confirm, and the activity is saved with those components.
In the next video you take a photo, set the status and leave a message.
05 Fotos, Status und Nachrichten
Every activity has its own messages. Changes are logged there, like the solution that was chosen. And you can tell the office what you found on site.
When the seal is in place, take a photo of it.
Then set the status: done, approved, damaged, and so on. The photo is saved with the activity, as proof of the work.
Add a message if you like. Now the activity is up to date for everyone on the project.
This works offline too. The photo and the status go to Office with your next sync.
That's the Orange Button Field app: from the plan on your phone to proof of every firestop in Office. Thanks for watching.
Videos
Weitere Videos
Kurze Videos pro Thema, vom Einstieg in Revit bis zu den OneClick apps. Sie laufen direkt hier.
